Performance characteristics
Introducing the LG9000 water-based adhesive, the ultimate choice for flooring that demands unparalleled elasticity and superior curing qualities. Specially crafted for wood flooring, SPC, WPC, and LVT, this exemplary adhesive excels both as a wet-bond and pressure-sensitive adhesive on pre-treated absorbent substrates. Its unique composition also permits limited application as a gap-filling and pressure-sensitive adhesive on non-absorbent surfaces or existing flooring. Experience the seamless, steadfast application that your projects truly deserve.
Transform your flooring installations with the LG9000 on non-absorbent substrates. Commence installation effortlessly within 20-50 minutes post-application and enjoy its lasting adhesion, exceptional peel and shear strength, rapid curing, and robust curing strength. Ensure your substrate is solid, smooth, dry, crack-free, and dust-free. For challenging surfaces like uneven, rough, dusty, or non-absorbent areas, reinforce the surface integrity with LG180 Substrate Hardener or LG670 Non-Absorbent Interface Agent to prevent debonding. Revel in unparalleled stability and performance.
Installation Instructions
Achieve impeccable wood flooring installations by using a B11 notched trowel, expertly designed for wood flooring adhesive. Replace the notched bar every 100 square meters for optimal performance. The open time varies based on adhesive quantity, climatic conditions, and substrate absorption rate. The adhesive signals its readiness for application once it begins forming strings, ensuring a flawless execution.
For the wet bonding of SPC, WPC, and LVT floors, employ a B1 notched trowel for optimal results, ensuring that the notched bar is replaced every 100 square meters. Begin installation when the adhesive starts forming strings, facilitating excellent transfer to the flooring's back. During installation, meticulously roll the entire surface with a roller and utilize a cork board to press edges and corners, ensuring a uniform, gap-free bond. Follow up with another roll after 20 minutes. For detailed guidance, adhere to Lan Guan's technical instructions to uphold the integrity of your flooring.