Performance characteristics
The LG9000 water-based adhesive stands as your ultimate choice for flooring projects requiring unparalleled elasticity and exceptional curing attributes. This adhesive is meticulously crafted to meet the demands of wood flooring, SPC, WPC, and LVT. Its versatility shines as it adeptly functions as both a wet-bond and pressure-sensitive adhesive on pre-treated absorbent substrates. The innovative formula also permits its use for gap-filling and as a pressure-sensitive adhesive on non-absorbent substrates or existing flooring. Experience the flawless, dependable application that your projects rightly deserve.
Transform your flooring installations with LG9000 on non-absorbent substrates. Initiate the installation a convenient 20-50 minutes after application, reaping the benefits of lasting adhesion, remarkable peel and shear strength, accelerated curing, and superior curing strength. Ensure that the substrate is sturdy, smooth, dry, crack-free, and dust-free. For challenging surfaces-be they uneven, rough, dusty, or non-absorbent-fortify the surface integrity with LG180 Substrate Hardener or LG670 Non-Absorbent Interface Agent to prevent debonding, delivering unmatched stability and performance.
Installation Instructions
Achieve impeccable wood flooring installation by using a B11 notched trowel, engineered specifically for wood flooring adhesive application. It is crucial to replace the notched bar every 100 square meters to maintain optimal performance. The open time is influenced by the adhesive amount, climatic conditions, and the substrate's absorption rate. The adhesive becomes operational as it begins to form strings, indicating its readiness for application.
For wet bonding SPC, WPC, and LVT floors, utilizing a B1 notched trowel is recommended. Replace the notched bar every 100 square meters to guarantee consistent results. Commence the installation once the adhesive starts forming strings, ensuring excellent transfer to the flooring's back. During installation, carefully roll the entire surface with a roller, and employ a cork board to press edges and corners, thus ensuring a uniform, gap-free bond. Conduct a follow-up roll 20 minutes later. For a complete installation process, adhere to Lan Guan's technical instructions, ensuring the unwavering integrity of your flooring.












