Performance characteristics
Unveiling the power of LG9000 water-based adhesive, your go-to solution for floor decoration made of materials demanding superior elasticity and curing excellence. Perfect for wood flooring, SPC, WPC, and LVT, this adhesive also shines as a wet-bond and pressure-sensitive hero on pre-treated absorbent surfaces. For those challenging non-absorbent substrates or pre-existing flooring, LG9000 offers limited yet effective gap-filling and pressure-sensitive capabilities. Elevate your flooring installations with this unmatched adhesive.
For non-absorbent surfaces, relish the flexibility of installing flooring 20-50 minutes post-adhesive application. With its enduring adhesion, robust peel, and shear strength, rapid curing, and formidable curing power, LG9000 sets the bar high. Ensure your substrate is impeccable: solid, smooth, dry, crack-free, and dust-free. If tackling uneven, rough, dusty, or non-absorbent surfaces, prepare with LG180 Substrate Hardener or LG670 Non-Absorbent Interface Agent to thwart any potential substrate debonding concerns. Achieve flawless results with these preparatory steps.
Installation Instructions
For a seamless wood flooring installation, employ a B11 notched trowel tailored for wood flooring adhesive. Remember to replace the notched bar every 100 square meters for optimal performance. The open time will vary based on adhesive quantity, climate conditions, and substrate absorption rate. Your adhesive is primed for action when it starts forming strings, signaling readiness for the next installation phase.
For the wet bonding of SPC, WPC, and LVT floors, a B1 notched trowel is your trusted companion. Replace the notched bar every 100 square meters to maintain precision. As the adhesive forms strings, commence flooring installation, ensuring it effectively adheres and transfers to the flooring's backside. Utilize a roller over the entire installed surface, and use a cork board to press edges and corners. Guarantee the surface is seamlessly flat, eliminating any dead spots, and enabling full adhesive bonding. Re-roll after 20 minutes to secure the installation. Adhere strictly to the technical instructions provided by Lan Guan for unparalleled results.












