Performance characteristics
Introducing the LG9000 water-based adhesive, your premier choice for achieving flooring perfection with its unparalleled elasticity and exceptional curing properties. Designed specifically for high-quality materials like wood flooring, SPC, WPC, and LVT, this superb adhesive offers versatile applications. Whether you require a wet-bond or a pressure-sensitive adhesive on pre-treated absorbent substrates, LG9000 is your answer. Additionally, its special formulation permits limited gap-filling and pressure-sensitive functions on non-absorbent substrates and existing flooring. Experience the seamless, dependable application that your projects truly deserve.
Elevate your flooring installations to new heights with the LG9000 on non-absorbent substrates. Begin your project effortlessly between 20-50 minutes post-application, taking advantage of its lasting adhesion, impressive peel and shear strength, rapid curing, and robust curing strength. Ensure your substrate is in prime condition-solid, smooth, dry, crack-free, and devoid of dust. For particularly challenging surfaces that are uneven, rough, dusty, or non-absorbent, fortify the surface integrity with the LG180 Substrate Hardener or the LG670 Non-Absorbent Interface Agent to prevent debonding. Enjoy unmatched stability and exceptional performance.
Installation Instructions
Achieve a flawless wood flooring installation with precision by using a B11 notched trowel, expertly crafted for wood flooring adhesive applications. Remember to replace the notched bar after every 100 square meters to ensure consistency. The open time varies based on adhesive quantity, climatic conditions, and substrate absorption rate. The adhesive is primed for application when it begins forming strings, indicating its readiness for a seamless application.
For the optimal wet bonding of SPC, WPC, and LVT floors, utilize a B1 notched trowel, designed to deliver impeccable results. Ensure to replace the notched bar every 100 square meters for consistent performance. Begin installation when the adhesive starts to form strings, ensuring the best possible transfer to the flooring's back. During installation, meticulously roll the entire surface with a roller and use a cork board for pressing edges and corners to secure a uniform, gap-free bond. Follow up with an additional roll 20 minutes later. For thorough guidance, adhere to Lan Guan's comprehensive technical instructions, ensuring the utmost integrity of your flooring.












