Performance characteristics
Introducing the LG9000 water-based adhesive, the pinnacle of flooring solutions. Engineered for unparalleled elasticity and exceptional curing, it is the go-to choice for wood flooring, SPC, WPC, and LVT. The LG9000's versatile nature makes it ideal for both wet-bond and pressure-sensitive applications on pre-treated absorbent substrates, while its special formulation allows its limited use on non-absorbent substrates or existing floors as a gap-filling and pressure-sensitive adhesive. Trust in its seamless and reliable application for the projects you envision.
Transform your flooring installations with the LG9000 adhesive on non-absorbent substrates. Installation can begin just 20-50 minutes post-application, offering enduring adhesion, remarkable peel and shear strength, rapid curing, and robust curing strength. Ensure substrates are solid, smooth, dry, crack-free, and dust-free. For challenging surfaces that are uneven, rough, dusty, or non-absorbent, upgrade the surface with LG180 Substrate Hardener or LG670 Non-Absorbent Interface Agent to prevent debonding. Experience unparalleled stability and high performance.
Installation Instructions
Master the art of flawless wood flooring installation using a B11 notched trowel specifically crafted for wood flooring adhesive. Replace the notched bar after every 100 square meters to maintain precision. The open time depends on adhesive quantity, climate conditions, and substrate absorption rates. The adhesive reaches optimal readiness once string formation begins, indicating its perfect moment for application.
For wet bonding SPC, WPC, and LVT floors, employ a B1 notched trowel. Replace the notched bar every 100 square meters to ensure consistency. Begin installation when string formation starts, ensuring impeccable transfer to the flooring's backside. During installation, meticulously roll the entire surface with a roller and use a cork board for precise pressing at edges and corners, securing a flawless, gap-free bond. Follow up with another roll after 20 minutes. For detailed guidance, adhere to Lan Guan's technical instructions to reinforce the integrity of your flooring.












